Portfolio / Project
American Lane
A green terracotta inlay running through the stone pillars of an Aspen residence — laid out, set into the field, and finished inside and out. Built from staging through final install.
Steel, Rainscreen & Tile · Colorado
Build process
From pavers to pillars.
Eight shots in build order — tile staging through setting and finished interiors. Click any photo to view it full-size.
01
Green terracotta inlay strips laid out on the pavers, ready to set into the pillars.
02
Exterior corner with several stone pillars, each receiving a green terracotta inlay.
03
Green terracotta inlay going into the main entrance pillar, entry still under build.
04
Wide view of the facade during construction — stone pillars and upper balconies.
05
Interior stone pillar with its green terracotta inlay set, room still unfinished around it.
06
Finished balcony — the green terracotta inlay runs as a vertical strip in the stone wall.
07
Entry pillars during construction — four green terracotta inlays set into the stone, materials staged on the pavers.
08
Finished interior stair — a vertical inset of green glass block set into the stone wall.